Swiss startup Sun-ways is planning to build a 18 kW pilot PV system between the racks of a 100-m linear section of a railway line in the Swiss canton of Neuchâtel.
So I have a solar setup-older panels, like 15 years old. They can be 3/4 obscured by a building or whatever, and still make 85% of what they’re rated to.
Which is fucking awesome. Right now, they’re covered in so much dust I can see the ‘clean’ spots where the morning dew condensed on them, and they’re still kicking 20 amps, about 15 more than I actually need.
Daily cleaning? Way excessive. Monthly? Maybe, probably less. Not a whole lot going on in between rails.
I’d be way more worried about tweakers trying to steal the wiring
So I have a solar setup-older panels, like 15 years old. They can be 3/4 obscured by a building or whatever, and still make 85% of what they’re rated to.
Which is fucking awesome. Right now, they’re covered in so much dust I can see the ‘clean’ spots where the morning dew condensed on them, and they’re still kicking 20 amps, about 15 more than I actually need.
Daily cleaning? Way excessive. Monthly? Maybe, probably less. Not a whole lot going on in between rails.
I’d be way more worried about tweakers trying to steal the wiring